The Standards Coordinator, Mohindar Sachdev, met with the Chairs of the Working Groups writing and revising standards documents at 8:00 AM / 9:45 AM on January 14, 2003 in Ballroom A / Ponte Verde II room, Phoenix-Scottsdale-Paradise Valley Embassy Suites, Phoenix, AZ.
The status of PARs, Standards and Guides, were reviewed at the meeting. The status of the PARs is summarized in this report. The actions to be taken for keeping up-to-date the approval of the PARs and for keeping live the Standards and Guides are identified. A summary of the specific approvals received, since the September 2002 meeting of the PSRC, are identified as well.
Information concerning the Standards Association (SA), Board of Governors, Committees of SA, the Development of standards, Recommended Practices and Guides and related issues is available on the following web site.
standards.ieee.org
Some of the other web sites for obtaining useful information are as follows.
The new policy in developing standards requires the implementation of the following metric policy.
Proposed new standards and revised standards submitted for approval shall use metric units exclusively in the normative portions of the standard. Inch-pound data may be included, if necessary, in footnotes or annexes that are informative only.
For more information visit thte following Web site.
standards.ieee.org/anouncements/metricpolicy
Standards Coordination Effort
PARs applied for by the Committees of the Power Engineering Society (PES) are being circulated among the Standards Coordinators of the PES Committees. The number and title of each new PAR approved by the Standards Board is posted on the PSRC Web site at the following address.
http://www.pes-psrc.org/Astandards.html
The copy of the PAR can be viewed by clicking at the number of the PAR in the list. All members of the PSRC are requested to review the newly approved PARs. If you are interested in the development work planned in a PAR, contact the Chair of the Working Group that is developing the document and sign up for participating in the activity of that Working Group.
STANDARDS ACTIVITIES SINCE THE SEPTEMBER 2002 MEETING OF THE PSRC The status of the standards approval activities, which have taken place since the September 2002 meeting of the PSRC, is as follows.
-
Standards Approved
PC37.94 Standard for N times 64 kilobit per second Optical Fiber Interface between Tele-protection and Multiplexer Equipment
PC37.95 Guide for Protective Relaying of Utility-Consumer Interconnections
PC37.104 Guide for Automatic Reclosing of Line Circuit Breakers for AC Transmission and Distribution Lines
Standards submitted for approval
Standards to be submitted for approval
PC37.106 Guide for Abnormal Frequency Protection for Generating Plants
PC37.115 Standard for Test Method for Use in the Evaluation of Message Communications Between Intelligent Electronic Devices in an Integrated Substation Protection, Control and Data Acquisition System
-
Standards recirculated
PC37.106 Guide for Abnormal Frequency Protection for Generating Plants
PC37.115 Standard for Test Method for Use in the Evaluation of Message Communications Between Intelligent Electronic Devices in an Integrated Substation Protection, Control and Data Acquisition System
Standards balloted
Standards submitted for balloting
PC37.90 Standard for Relays and Relay Systems Associated with Electric Power Apparatus
PC37.93 Guide for Power System Protective Relay Applications of Audio Tones over Telephone Channels
PC37.103 Guide for Differential and Polarizing Circuit Testing
Standards being balloted
Standards to be expedited for submission
PC37.105 Standard for Qualifying Class 1E Protective Relays and Auxiliaries for Nuclear Power Generating Stations
The PARs approved since September 2002, submitted, and the PARs for which extension has been applied are as follows. The PARs, which will expire in the near future, are also listed. Applications for extending the lives of these PARs should be filed soon.
New PAR applied for
PAR approved by NesCom
PAR extensions applied for
PAR extensions approved by NesCom
PARs expiring at the end of 2003
PC37.92 Standard for Low Energy Analog Signal Inputs to Protective Relays
PC37.103 Guide for Differential and Polarizing Circuit Testing
PC37.105 Standard for Qualifying Class 1E Protective Relays and Auxiliaries for Nuclear Power Generating Stations
PC37.106 Guide for Abnormal Frequency Protection for Power Generating Plants
PC37.109 Guide for the Protection of Shunt Reactors
PC37.114 Guide for Determining Fault Location on AC Transmission and Distribution Lines
PC37.115 Standard for Test Method for Use in the Evaluation of Message Communications Between Intelligent Electronic Devices in an Integrated Substation Protection, Control and Data Acquisition System
PC37.116 Guide For Protective Relay Application To Transmission-Line Series Capacitor Banks
SUBMITTAL DEADLINES & STANDARDS BOARD MEETING SCHEDULE
PAR/Standard Submittal Deadline |
Standards Board Meeting |
February 7, 2003 |
February 28, 2003 |
May 2, 2003 |
June 12, 2003 |
August 1, 2003 |
September 11, 2003 |
October 31, 2003 |
December 10, 2003 |
|
For further information download the report and spreadsheet from this site |
or contact: Mohindar S. Sachdev - PSRC Standards Coordinator at |
sachdev@engr.usask.ca
|
|