Standard Coordinators Report

2006 - January 10



The Standards Coordinator, Jeffrey Gilbert, met with the Chairs of the Working Groups writing and revising standards documents at a session beginning at 8:00 AM on January 10, 2006, in the LaNouvelle West room of the Monteleone Hotel, New Orleans, LA.  

Jodi Haasz and Matthew Ceglia answered many questions concerning various aspects of standards development.

The status of selected PARs, Standards and Guides, were reviewed at the meeting. The status of the PARs is summarized below. The actions to be taken for keeping up-to-date the approval of the PARs and for keeping live the Standards and Guides are identified. A summary of the specific approvals received, since the September 2005 meeting of the PSRC, are identified as well.

Information concerning the Standards Association (SA), Board of Governors, Committees of SA, the Development of standards, Recommended Practices and Guides and related issues is available on the following web site.

http://standards.ieee.org/

Some of the other web sites for obtaining useful information are as follows.

 

                                                                                                                                               

Information on

Web site address

Update your information with SA

 

http://standards.ieee.org/resources/development/

myBallot Voter presentation

http://standards.ieee.org/db/balloting/myballotdemo.ppt

Patent Issues WG  slide show

http://standards.ieee.org/resources/development/writing/copyright_training.html

 

myBallot Chair presentation

http://standards.ieee.org/db/balloting/myballotchairdemo.ppt

 

PAR application, extension and other forms

http://www.standards.ieee.org/guides/par/

 

 

Submitting a PAR

http://standards.ieee.org/guides/par/ePARform.html

PAR Extension

http://standards.ieee.org/guides/par/extension.rtf

Style manual

http://www.standards.ieee.org/guides/style/2000Style.pdf

Template

http://www.standards.ieee.org/resources/spasystem/index.html

Up-load drafts for balloting

http://standards.ieee.org/eprocess/upload_balloting_file/

 

Request for invitation to ballot

http://standards.ieee.org/resources/development/

Follow: Balloting the Draft ® Ballot Invitation ® Requesting a Ballot Invitation

Join a balloting pool

 

Submit request for initiating balloting

http://standards.ieee.org/resources/development/

Follow: Balloting the Draft ® Sponsor Ballot ® Requesting Initiation of a Ballot

Submit request for recirculation ballot

http://standards.ieee.org/resources/development/

Follow: Balloting the Draft ® Sponsor Ballot ® Requesting Initiation of a Ballot ® Recirculation ballot

Status of standards etc

Http://www.standards.ieee.org/db/status/status.txt

NesCom activities

http://www.standards.ieee.org/board/nes/

RevCom activities

http://www.standards.ieee.org/board/rev/

SA Operations Manual

http://standards.ieee.org/sa/sa-om-toc.htm

 

SA Bylaws

http://standards.ieee.org/guides/bylaws/index.htm

SB Operations Manual

http://standards.ieee.org/guides/opman/index.html

SB Bylaws

http://standards.ieee.org/guides/bylaws/index.html

 

 


Some important Information

The IEEE-SA Standards Board Bylaws and the IEEE-SA Standards Board Operations Manual. The text of the changes made to these documents in 2005 can be found at:

http://standards.ieee.org/board/pro/2005cf

IEEE requires a two slide patent presentation at the start of every working group meeting.  The presentation is available at:

 

http://standards.ieee.org/resources/development/writing/copyright_training.html

 


Standards Coordination Effort

PARs applied for by all Committees of the Power Engineering Society (PES) are circulated among the Standards Coordinators of the PES Committees. Every PAR approved by the Standards Board is posted on the SA Web site at the following address.

http://standards.ieee.org/board/nes/approved.html

If you are interested in the development work planned in a PAR, contact the Chair of the Working Group that is developing the document and sign up for participating in the activity of that Working Group.


Standards Activities Since The September 2005 Meeting

The status of the standards activities, which have taken place since the September, 2005, meeting of the PSRC, are as follows.

1.           Standards Published

None

 

 

 

2.              Standards waiting to be Published

PC37.90

Standard for Relays and Relay Systems Associated with Electric Power Apparatus

PC37.118

Standard for Synchrophasors for Power Systems

 

PC37.119

Guide for Breaker Failure Protection

 

PC57.13.3

Guide for Grounding of Instrument Transformer Secondary Circuits and Cases (after resolving negative ballots)

3.              Standards reaffirmation ballots conducted

C37.96

Guide for AC Motor Protection

C37.99

Guide for Protection of Shunt Capacitor Banks

4.              Standards withdraw

None

 

5.              Standards approved

PC37.90

Standard for Relays and Relay Systems Associated with Electric Power Apparatus

PC37.118

Standard for Synchrophasors for Power Systems

 

PC37.119

Guide for Breaker Failure Protection

 

PC57.13.3

Guide for Grounding of Instrument Transformer Secondary Circuits and Cases (after resolving negative ballots)

6.           Standards submitted for approval

None

 

7.           Standards to be submitted for approval

None

 

8.           Standards Balloted                                   

PC37.231

Recommended Practice for Microprocessor-based Protection Equipment Firmware Control

9.           Submitted for Balloting/ Recirculation

PC37.101

Guide for Generator Ground Protection

 

PC37.116

Guide For Protective Relay Application To Transmission-Line Series
Capacitor Banks

 

PC37.231

Recommended Practice for Microprocessor-based Protection Equipment Firmware Control

10.        Standards Recirculated

PC37.101

Guide for Generator Ground Protection

 

PC37.116

Guide For Protective Relay Application To Transmission-Line Series
Capacitor Banks

 

PC37.118

Standard for Synchrophasors for Power Systems

 

PC37.119

Guide for Breaker Failure Protection

 

PC57.13.3

Guide for Grounding of Instrument Transformer Secondary Circuits and
Cases (after resolving negative ballots)

11.        Standards to be re-circulated

PC37.102

Guide for AC Generator Protection                                                       

PC37. 105

Standard for Qualifying Class 1E Protective Relays and Auaxiliries for Nuclear Power Generating Stations

PC37.109

Guide for the Protection of Shunt Reactors

12.        Standards to be submitted for Re-affirmation

C37.112

Standard Inverse-Time Characteristic Equations for Overcurrent Relays

 

The PARs approved since September, 2005, submitted, and the PARs for which extension has been applied are as follows.  The PARs, which will expire in the near future, are also listed.  Applications for extending the lives of these PARs should be filed soon.

 

13.        New PARs applied for

None

 

14.        New PARs approved

PC37.113

Guide for Protective Relay Applications of  Transmission Lines

PC37.233

Guide For Power System Protection Testing

PC37.234

'Guide for Protective Relay Applications to Power System Buses

PC37.235

Guide for the Application of Rogowski Coils used for Protective Relaying Purposes

15.        PAR Extensions applied for

PC37.105

Standard for Qualifying Class 1E Protective Relays and Auxiliaries for Nuclear Power Generating Stations

 

 

PC37.109

Guide for the Protection of Shunt Reactors

 

PC37.116

Guide For Protective Relay Application To Transmission-Line Series Capacitor Banks

 

PC57.13.1

Guide for Field Testing of Relaying Current Transformers

 

16.        PAR Extensions approved

PC37.105

Standard for Qualifying Class 1E Protective Relays and Auxiliaries for Nuclear Power Generating Stations

 

 

PC37.109

Guide for the Protection of Shunt Reactors

 

PC37.116

Guide For Protective Relay Application To Transmission-Line Series
Capacitor Banks

 

PC57.13.1

Guide for Field Testing of Relaying Current Transformers

 

17.        Modified PAR approve

None

18.        Modified PAR Submitted

None

19.        PARs expiring at the end of 2006

PC37. 98

Standard  Seismic Testing of Relays

 

 

PC37.101                     

Guide for Generator Ground Protection

 

PC37.102

Guide for AC Generator Protection

 

PC57.109

Guide for the Protection of Shunt Reactors

 

PC37.110

Guide for the Applications of Current Transformers Used for Protective Relaying Purposes

 

PC37.116

Guide For Protective Relay Application To Transmission-Line Series Capacitor Banks

 

PC37.117

Guide for the Application of Protective Relays Used for Abnormal Frequency Load Shedding and Restoration

 

PC37.230

Guide for Protective Relay Applications to Distribution Lines

 

PC37.231

Recommended Practice for Microprocessor-based Protection Equipment Firmware Control

 

PC57.13.1

Guide for Field Testing of Relaying Current Transformers

 

 

 

 

SUBMITTAL DEADLINES & STANDARDS BOARD MEETING SCHEDULE

PAR/Standard Submittal Deadline

Standards Board Meeting

February 17, 2006

March 28, 2006

April 28, 2006

June 6, 2006

August 4, 2006

September 14, 2006

October 16, 2006

December 1, 2006

 

For further information download the report and spreadsheet from this site

or contact: Jeffrey G. Gilbert - PSRC Standards Coordinator at

jggilbert@ieee.org/font>