Agenda
Systems Protection Subcommittee of the PSRC
January 11, 2012
4:30 – 5:45 P.M.
|
Solveig Ward |
Jim O’Brien jim.o’brien@duke-energy.com |
|
Chair |
Vice Chair |
1. Introduction of Participants
2. Approval of September 2011
Meeting Minutes
3. Advisory Committee Items of
Interest
4. Working Group Reports
|
C2 The Role of Protective
Relaying in the Smart Grid |
Alex Apostolov |
|
C4 Guide for Functional
Requirements for Phasor Data Concentrator PC37.244 |
Galina Antonova |
|
C5 Guide for
Synchronization, Calibration, Testing, and Installation of Phasor Measurement
Units PC37.242 |
Farnoosh Rahmatian |
|
C13 Undervoltage Load
Shedding |
Miroslav Begovic |
|
C14 Use of Time
Synchronized Measurements in Protective Relay Applications |
Jim O’Brien |
|
C15 Design and Testing of
Selected SIPS |
Jon Sykes |
|
C16 Relay Scheme Circuit
Design Using Microprocessor Relays |
Raluca Lascu |
|
C17 Fault Current
Contributions from Wind Plants |
Dean Miller |
|
CTF3 Define Joint Activity
with PSSC |
Charlie Henville |
|
CTF18 Transmission to
Generation Interconnection Protection Considerations |
Alla Deronja |
5. Liaison Reports
|
PES Power System Analysis, Computing, and Economics |
Mal Swanson |
6. Old Business
7. New Business
8. General Discussion