Power System Relaying Committee, Relaying Practices Subcommittee
AGENDA
September 14-17, 2009,
Sheraton Arlington Hotel
, Arlington, Texas, United States
Item underlined are hyperlinks
1. Introductions, Attendance List
2. Approval of
Previous Meeting Minutes
3. Items of interest from the Coordination & Advisory Committee Meetings
4. Reports from the Working Group Meetings
I2 - M.J. Swanson
Terminology Review
I3 - J. Jodice
Relay Functional Type Testing
I4 - E.A. Udren
IEC Standards Advisory
I5 - K. Donahoe
Schematic Representation of Power System Relaying
I6 - L. Kojovic
Practical aspects of Rogowski coil applications to relaying
I8 - B. Mugalian
Revision to Guide for Grounding of Instrument Transformer
I9 - S. Usman
Revision of C37.105, Standard For Qualifying Class 1E Relays And Auxiliaries For Nuclear Power Plants
I10 - M. Nemier
Revision of 37.98-1987 - Standard for Seismic Testing of Relays
I11 - H. Gilleland
The Application of Optical Instrument Transformers for Protective Relaying
I15 - G. Moskos
Revision of C37.110, IEEE Guide for the Applications of Current Transformers Used for Protective Relaying Purposes
I17 - M. Carpenter
Trends in Relay Performance
I18 - P.G. McLaren
Anomaly Checks on Relay
Settings
I19 - S. Ward
Protective Relaying and Redundancy
I20 - T. Beckwith
Revision of C37.90.1: Surge Withstand Capability Tests
5. Task Force Reports
ITF1 - J. Jodice
Relay Service Letter Database Project
ITF2 - J.T. Tengdin
Promotion of Dual logo of C37.2
(No Meeting)
ITF7 - J. Burnworth
Reaffirmation of IEEE C37.90.2 Standard for Withstand Capability of Relay Systems to Radiated Electromagnetic Interference from Transceivers
ITF9 - T. S. Sidhu
Reaffirmation of C37.103 Guide for Differential and Polarizing Relay Circuit Testing
6. Liaison Reports
7. Coordination Reports
8. Old Business
9. New Business
10. Adjournment
This page was last updated on September 13, 2009 by Mohammad.